Search circulars
BRPD Circular No. 08/2012Ready14 June 2012 · 8 pages

Master circular on Loan Rescheduling

বিআরপিডি সার্কুলার নং ০৮/২০১২

Summary

  • A master circular consolidates loan rescheduling rules, stating rescheduling should be limited and restricted to avoid overstated capital.

    Page 1 · Ready
  • Banks need Board-approved policies, careful assessment, Credit Committee justification and Board/EC approval.

    Page 1 · Ready
  • Maximum periods and down payments are set by loan type, classification and round (e.g. term loans 25%/10%, 30%/20%, 50%/30%); at most three reschedulings.

    Page 4 · Analysing
  • Covers classification, new facilities (15% payment), CIB reporting, special cases and term loan maturity extension (max 25%); earlier circulars voided; effective immediately.

    Page 6 · Ready

What has changed

  • Consolidated rescheduling regime replacing BRPD Circulars 01/2003, 04/2005, 02/2006 and 03/2006.

    Page 8 · Analysing

Requirements

  • Board-approved rescheduling policy no more lenient than circular: Banks must have a Board-approved policy defining when loans may be rescheduled, consistent with and not more lenient than this circular, with controls against routine/repeat rescheduling and strict limits for unproductive or unprofitable businesses; exceptions must be identified and justified.

    Page 1 · Ready
  • Examine causes of non-performance: On a rescheduling request, the bank must meticulously examine why the loan became non-performing.

    Page 2 · Ready
  • No rescheduling for fund diversion or habitual defaulters: If funds were diverted or the borrower is a habitual defaulter, the application may not be considered and legal recovery steps must be taken.

    Page 2 · Ready
  • Address cash down payment applications within 3 months: When the required down payment is paid in cash, the bank must address the application within 3 months of receipt.

    Page 2 · Ready
  • Encash instruments before processing; past payments not down payment: Cheques/pay orders for down payment must be encashed before processing; previous payments may not be treated as down payment.

    Page 2 · Ready
  • Assess overall repayment capability: Banks must consider the borrower's overall repayment capability including liabilities with other banks/FIs, and review cash flow, audited and other financial statements.

    Page 2 · Ready
  • Spot inspection and preserve reports: If required, officers must inspect the business on the spot and branches must preserve the reports for BB inspection.

    Page 2 · Ready
  • Reschedule only after due diligence; else legal action and provision: A loan may be rescheduled only if due diligence shows the borrower can repay; otherwise legal steps and necessary provision are required.

    Page 2 · Ready
  • Credit Committee written justification: The Credit Committee must justify each rescheduling in writing, covering benefits to profitability and capital adequacy, grounds for full repayment, and impact on liquidity and other customers.

    Page 2 · Ready
  • Evaluate each case on merits within maximum time limits: Rescheduling periods are absolute maximums; each loan must be judged on merits, not automatically given maximum time or three reschedulings.

    Page 2 · Ready
  • Continuous and demand loan rescheduling time limits and conditions: For continuous and demand loans, rescheduling periods may not exceed the limits in the tables by classification and round (e.g. up to 12, 9 or 6 months on first rescheduling and shorter thereafter); all payments must be made, repayment is monthly, and 3 defaulted monthly instalments make the loan Bad/Loss.

    Page 3 · Ready
  • Term loan rescheduling time limits: For term loans, first rescheduling may not exceed 18/12/9 months (SS/DF/BL) from expiry; second 12/9/6 months; third 9/6/3 months; repayment monthly/quarterly; 6 monthly or 2 quarterly defaults make it Bad/Loss.

    Page 4 · Ready
  • Agricultural and micro-credit rescheduling limits: Short-term agricultural and micro-credit rescheduling may not exceed 2 years (first), 1 year (second) and 6 months (third).

    Page 4 · Ready
  • No rescheduling after default following third rescheduling: If a loan defaults after the third rescheduling, the borrower is a habitual defaulter and no further rescheduling may be considered.

    Page 4 · Ready
  • Board/EC approval for rescheduling: Loans sanctioned at MD/Board level need Board approval; those below MD level need Board or Executive Committee approval to reschedule.

    Page 4 · Ready
  • Appraise Board/EC on income implications in signed memo: The bank must brief the Board/EC in detail on income and other implications, via a memo signed by the branch manager and MD.

    Page 4 · Ready
  • Term loan down payment: Term loan rescheduling may be considered only after cash down payment of at least the lower of 25% of overdue or 10% of outstanding (first), 30%/20% (second), 50%/30% (third); the same applies to agricultural and micro-credit.

    Page 5 · Analysing
  • Demand/continuous loan conversion down payment: On converting demand/continuous loans to term loans, first rescheduling needs cash down payment of 15% (up to Tk 1 crore), 10% (Tk 1-5 crore, min Tk 15 lac) or 5% (above Tk 5 crore, min Tk 50 lac); later rounds 30%/20% and 50%/30%.

    Page 5 · Ready
  • Classify and provision rescheduled loans per BRPD 07/2012: Rescheduled loans must be classified and provisioned, and interest accounted for, per BRPD Circular 07/2012.

    Page 6 · Ready
  • New facility only after 15% of outstanding paid: New or enhanced facilities after rescheduling require payment of at least 15% of the outstanding balance (excluding down payment); other banks need the same plus an NOC; exporters (not wilful defaulters) 7.5%.

    Page 6 · Ready
  • BB prior approval for director-related loans: Prior Bangladesh Bank approval is required if the loan relates to a director of any bank.

    Page 7 · Ready
  • Report rescheduled loans to CIB as RS/RSIW: Rescheduled loans must be reported to CIB as RS-1/2/3, or RSIW-1/2/3 when interest was waived.

    Page 7 · Ready
  • Show rescheduling count in sanction letter and CL form: The rescheduling count must be mentioned in the sanction letter and the CL form date column.

    Page 7 · Analysing
  • Garment stock-lot and fertilizer subsidy loans: no down payment, proceeds to repay: Export garment loans classified due to stock lot and fertilizer importer loans classified due to delayed subsidy may be rescheduled without down payment, but stock-lot proceeds/subsidy must repay the loan; not for forced, project or term loans in the garment sector except stock-lot-backed forced loans; new loans after 7.5% payment and NOC.

    Page 7 · Ready
  • Term loan maturity extension conditions: Term loan maturity may be extended only if the loan is performing (Standard/SMA), the decision is at the original sanctioning level, and the extension is at most 25% of the remaining term.

    Page 8 · Ready

Who it applies to

Dates

Related circulars

Source: Bangladesh Bank. Each point links to the page of the original circular it comes from. All BRPD circulars